We initially only intended to replace the vanity top and leaking sinks, but one thing led to another, and well, we basically ended up redoing the whole thing. The vanity top and sinks were installed by a repairmen (with Andrew's help), and it took us (mostly me, done while Andrew was traveling on business) nearly 3 weeks to do everything else. It really was a lot of fun to do and now I'm looking forward to redoing our master bathroom- which is currently a 1970s-pink. The hardest part of the whole process was overcoming my fear of the tile cuter shown below. After a few tries though I discovered that it was pretty easy to use.
Andrew may feel like his manhood is threatened, but I must say that I really enjoy fixing things up around the house.
